Product range

Find the part family, then send the evidence needed for matching.

The catalog is organized around bearing parts, drawing-based machining, mining equipment spares, and heavy equipment maintenance systems. Final selection depends on machine model, part number, drawing, sample condition, material, quantity, and destination port.

Send RFQ

Identify the machine system

Start with where the part works: ground engaging, linkage, undercarriage, hydraulic sealing, rubber isolation, or crushing and screening.

Collect matching evidence

Part number, machine model, dimensions, sample photos, and drawings make the RFQ review more reliable.

Confirm what cannot be guessed

Material, hardness, tolerance, compound, mold status, MOQ, and lead time are reviewed before quote.

Bearing parts, housings, sleeves, bushings, and related accessories for construction and mining equipment repair.

Applications
Excavator swing system repair, Loader and crane maintenance, Mining equipment rotating assemblies
Compatible equipment
Excavators, Wheel loaders, Cranes, Drilling rigs, Mining conveyors
Material options
Bearing steel, 42CrMo, 40Cr, Bronze, Customer grade on drawing
MOQ / lead time
Project based by size and drawing · 25-45 days after drawing, sample, or model confirmation
02

Replacement teeth and adapters for digging, loading, quarry, and general earthmoving applications.

Applications
Earthmoving, Quarry loading, General excavation
Compatible equipment
Excavators, Wheel loaders, Backhoe loaders
Material options
Alloy steel, Heat-treated casting, Customer grade on request
MOQ / lead time
50-200 pcs by model · 15-35 days after drawing/model confirmation

Machined linkage parts for repair kits, rebuild work, and distributor stock programs.

Applications
Boom linkage repair, Bucket linkage rebuild, Heavy equipment maintenance
Compatible equipment
Excavators, Loaders, Dozers, Mining trucks
Material options
40Cr, 42CrMo, Bronze, Grease groove customization
MOQ / lead time
20-100 sets by dimension · 20-30 days after sample or drawing approval

Drawing-based machined replacement parts including shafts, sleeves, bearing seats, spacers, and flanges.

Applications
Drawing-based replacement, OEM-style spare parts, Repair workshop custom production
Compatible equipment
Construction machinery, Mining equipment, Crushers, Screens, Conveyors, Hydraulic equipment
Material options
Carbon steel, Alloy steel, 42CrMo, 40Cr, Stainless steel, Bronze
MOQ / lead time
By drawing, process, and material · 20-50 days after drawing and process confirmation

Crawler replacement parts for repair workshops, rental fleets, and mining maintenance teams.

Applications
Crawler undercarriage repair, Mining fleet maintenance, Rental fleet service
Compatible equipment
Crawler excavators, Dozers, Crawler drills
Material options
Forged steel, Heat-treated rim, Sealed and lubricated assemblies
MOQ / lead time
10-50 pcs by item · 25-45 days depending on model mix
06

Seal kit sourcing for cylinder rebuilds and hydraulic maintenance across heavy equipment.

Applications
Cylinder rebuild, Excavator service, Mining hydraulic maintenance
Compatible equipment
Excavators, Wheel loaders, Hydraulic breakers, Drilling rigs
Material options
NBR, PU, FKM, PTFE, Fabric reinforced rubber
MOQ / lead time
100 kits by model · 10-25 days after specification confirmation

Rubber pads, mounts, gaskets, and bonded parts for custom replacement or private-label needs.

Applications
Vibration isolation, Wear protection, Dust sealing, OEM replacement
Compatible equipment
Crushers, Screens, Conveyors, Construction machinery
Material options
NR, SBR, EPDM, NBR, PU, Metal-bonded rubber
MOQ / lead time
By mold and compound · 25-40 days for new mold development

Wear parts for crushing, screening, quarry maintenance, and aggregate production lines.

Applications
Crushing, Screening, Aggregate production, Quarry maintenance
Compatible equipment
Jaw crushers, Cone crushers, Impact crushers, Vibrating screens
Material options
High manganese steel, High chromium iron, PU screen panel, Wear-resistant plate
MOQ / lead time
Project based · 30-55 days after drawing and material confirmation

Project-based mining equipment assemblies and spare parts for crushing, screening, conveying, and site maintenance.

Applications
Crushing and screening plants, Mine material handling, Maintenance replacement projects
Compatible equipment
Crushers, Vibrating screens, Feeders, Conveyors, Drilling and auxiliary mining equipment
Material options
Steel fabrication, Alloy steel, Wear-resistant steel, Rubber and PU parts, Customer specification
MOQ / lead time
Project based · 30-70 days after technical scope confirmation